News Headline
The Red-Dead water conveyer can avoid a dead end
Source
SciDev.net
Publication Date
2013-03-20
After a delay of more than six months, the World Bank has finally released the final drafts of the feasibility and environmental assessment studies for the controversial Red Sea-Dead Sea Water Conveyance project, designed to channel some 1.2 billion cubic metres of water 180 kilometres from the Red Sea to the Dead Sea. [1]